Laserfiche WebLink
The outer slopes of the projects final cover will not be steep. Establishment of vegetation <br />will provide adequate erosion control. <br />The new ditches will be lined with erosion control mats. Interim erosion control will <br />include straw wattles, placed along the outer slopes, near the fence. <br />13.0 IMPLEMENTATION OF LEACHATE CONTROL MEASURES <br />CHSL does not have a liner and does not have a leachate collection system. The closure <br />cap extension area will not include a leachate collection system. Leachate will be <br />controlled by maintaining proper cover to promote runoff prior to infiltration. <br />No new groundwater monitoring wells will be installed for this project. <br />No new soil gas monitoring wells will be installed for this project. <br />Prior to the closure cap extension project, the County intends to installation of four new <br />LFG extraction wells (Figure 3). The wells will be installed to the depth of refuse in the <br />closure cap extension area. The new wells will be connected to the existing LFG system. <br />Closure Plan Addendum San Joaquin County <br />Corral Hollow Sanitary Landfill 8 Department of Public Works <br />April 4, 2008 Solid Waste Division <br />