Initial costs escalated to 2007 dollars by CIWMB inflation factors (Table 1). Final cover <br />maintenance for the closure cap extension area is an estimated average annual value. <br />7.0 DRAINAGE SYSTEM MAINTENANCE <br />Per section 5.2, the existing drainage patterns of CHSL will not be significantly changed <br />by the closure cap extension project. The drainage system maintenance cost of the <br />closure cap extension project is not included as an additional cost, but considered part of <br />the initial drainage maintenance cost of CHSL. The Initial costs to maintain drainage <br />system of the Landfill has been escalated to 2007 dollars by CIWMB inflation factors <br />(Table 1). <br />Initial inspection costs have been escalated from the original estimate to 2007 dollars by <br />CIWMB inflation factors (Table 1). Inspection cost for the closure cap extension project is <br />based on the 10 percent proportional increase of the closure cap area. <br />Initial costs escalated to 2007 dollars by CIWMB inflation factors (Table 1). <br />The annual cost to maintain the Corral Hollow Landfill is approximately $80,000 <br />(2007 dollars) (Table 1). <br />Postclosure Maintenance Plan Addendum San Joaquin County <br />Corral Hollow Sanitary Landfill 8 Department of Public Works <br />April 2, 2008 Solid Waste Division <br />