Laserfiche WebLink
0 <br />The stockpile of cover material is located adjacent to the proposed <br />Winter Dump area and is adequate for site needs. To supplement this <br />if needed, we will also receive off site fill dirt from different <br />sources. <br />This Winterization Plan is designed for seasonal operations for the <br />1995-96 winter. In addition, .•e• drainage, refuse space, and <br />• material are provided to insure limited maintenance and <br />normal operation •' the • <br />cc: Stephen Chen <br />Thank you, <br />Phil Giambastiani <br />Pres. - GAMBI ENT., INC. <br />