My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
0
>
4400 - Solid Waste Program
>
PR0440006
>
COMPLIANCE INFO_1993-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2021 2:10:13 PM
Creation date
7/3/2020 11:06:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-1996
RECORD_ID
PR0440006
PE
4434
FACILITY_ID
FA0004515
FACILITY_NAME
FRENCH CAMP LANDFILL
STREET_NUMBER
0
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95231
APN
16307035
CURRENT_STATUS
02
SITE_LOCATION
MANTHEY RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440006_0 MANTHEY_1993-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W <br />FINAL COVER <br />P <br />Final cover at French Camp Landfill will be applied as each 15 acre <br />module site reaches capacity. The final cover will consist of a 2 <br />foot foundation layer followed by a 1 foot clay layer and a 1 foot <br />vegetation layer. Soils for the entire 4 feet of final cover will <br />be imported from outside sources.. Total soil needs for the 60 acre <br />landfill are shown in Table 2. The final cover will be applied by <br />"on-site" landfill equipment. <br />The foundation layer may consist of materials from the City's <br />Austin Road Landfill borrow pit, City's construction projects or <br />other approved sources. The next one foot layer will consist of <br />imported clay material. The clay material will be compacted to 950-o <br />of maximum density to obtain a permeability of 00000i cm/sec or <br />less. If 9511 compaction and the permeability specification cannot <br />be reached by normal methods, other amendments will be added to the <br />soil, so that the .000001 cm/sec permeability can be met. The <br />vegetation layer soil will be imported from other soil source <br />sites. The vegetation layer will be seeded with grass upon <br />completion. <br />As Table 2 indicates, approximately 387,000 cubic yards of cover <br />material are necessary to apply the 4 feet of final cover over the <br />landfill. Using a 25 ton truck -trailers, it would take about <br />21,500 loads of imported soil cover material. Based on an <br />application rate of about 6 loads per hour, it would take <br />approximately 112 days to apply final cover to each 15 acre module <br />site. <br />Final Cover <br />Depth <br />Cubic Yard <br />Foundation Layer <br />2 feet <br />193,600 <br />Clay Layer <br />1 foot <br />96,800 <br />Vegetative Layer <br />FTotal Cover <br />1 foot <br />4 feet <br />96,800 <br />387,200 cu. yd.l <br />FWAPEWA ME <br />0 WOW 0 4 <br />VA <br />
The URL can be used to link to this page
Your browser does not support the video tag.