Laserfiche WebLink
I M I M .0190-01M 1 W10714 �O M <br />The stockpile of cover material is located adjacent to the proposed <br />Winter Dump area and is adequate for site needs. To supplement this <br />we also receive off site fill dirt from different sources. <br />This 71finterization Plan is designed for seasonal operations for the <br />1994-95 winter. In addition, adequate drainage, refuse space, and <br />cover material are provided to insure limited maintenance and <br />normal operation of the landfill. <br />Thank you, <br />1 61 <br />Phil eiaMbastiani <br />Pres. - GAMBI ENT., INC. <br />