My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
0
>
4400 - Solid Waste Program
>
PR0440006
>
COMPLIANCE INFO_1993-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2021 2:10:13 PM
Creation date
7/3/2020 11:06:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-1996
RECORD_ID
PR0440006
PE
4434
FACILITY_ID
FA0004515
FACILITY_NAME
FRENCH CAMP LANDFILL
STREET_NUMBER
0
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95231
APN
16307035
CURRENT_STATUS
02
SITE_LOCATION
MANTHEY RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440006_0 MANTHEY_1993-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br />CITY OF STOCKTON <br />AZO <br />DEPARTMENT OF PUBLIC WORKS <br />CITY HALL <br />425 N. EL DORADO STREET <br />STDCKTON, CA 95202-1997 <br />January 22, 1993 <br />SAN JOAQUIN COUNTY PUBLIC HEALTH SERVICES <br />Environmental Health Division <br />P.O. Box 2009 <br />Stockton, CA 95201 <br />ATTN: Ed Padilla, REHS <br />Kt C9110i� � <br />JAN 2 5 1999 <br />ENVIRONMENTAL HEALTH <br />PERMIT/SERVICES <br />FRENCH CAMP LANDFILL ADMINISTRATIVE HEARING: COMPLIANCE AGREEMENT <br />This compliance agreement is our work plan to correct deficiencies <br />at the French Camp Landfill discussed at the Administrative hearing <br />held at your office on Thursday, January 14, 1993. <br />I. ACTIVE WORKING FACE ... The active working face will be reduced to <br />one area immediately. The former wet <br />weather area will be completely covered as <br />soon as conditions permit. During the <br />inclement weather when transporting clay <br />cover material is futile, we propose to <br />use geo-synthetic material to cover <br />the deposited "greenwaste" at the end of <br />each week. <br />II. WINTER PLAN .......... A revised winter plan will be submitted to <br />your office immediately. Approximately 30 <br />loads of cover material, from Austin Road <br />Landfill, stockpiled for use at the <br />original winter plan site have been used. <br />All dirt cover material will be excavated <br />from the sedimentation oond area. <br />III. PERFORMANCE ......... The working face 'Ad' of 7,000 S.F. and <br />STANDARD 'Awl of 6,090 S.F. will be complied with. <br />Stakes or cones will be posted delineating <br />the working area. <br />IV. INTERMEDIATE ........Areas where 12" of soil cover are <br />COVER deficient will be corrected within 90 <br />working days weather permitting. <br />V. REPORT OF DISPOSAL .... RDSI draft completed. Final RDSI to be <br />SITE INFORMATION submitted by February 26, 1993. <br />"STOCKTON... CALIFORNIA'S SUNRISE SEAPORT" <br />
The URL can be used to link to this page
Your browser does not support the video tag.