My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
0
>
4400 - Solid Waste Program
>
PR0440006
>
ARCHIVED REPORTS_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 6:15:46 AM
Creation date
7/3/2020 11:06:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006
RECORD_ID
PR0440006
PE
4434
FACILITY_ID
FA0004515
FACILITY_NAME
FRENCH CAMP LANDFILL
STREET_NUMBER
0
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95231
APN
16307035
CURRENT_STATUS
02
SITE_LOCATION
MANTHEY RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440006_0 MANTHEY_2006.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FRENCH CAMP LANDFILL <br /> WINTERIZATION 2005-2006 <br /> The French Camp Landfill (FCL) is presently in the Initial Phase of Closure, <br /> which primarily involves the relocation of demolition wastes from perimeter <br /> slopes, placement of these wastes within lower interior areas, and placement of <br /> soil foundation, barrier, and vegetative layers of the approved final cover. <br /> The Closure Construction is being performed by GUINN Construction, and <br /> Construction Quality Assurance monitoring is being performed by VECTOR <br /> Engineering. The closure construction documents, as approved by both the <br /> Regional Water Quality Control Board (RWQCB) and the California Integrated <br /> Waste Management Board (CIWMB) include requirements for Dust, Pollution, <br /> and Erosion Control Measures throughout closure construction <br /> As the 60-acre closure area has the potential for release of sediment to the <br /> adjacent French Camp and Walker Sloughs, Forward Inc. retained <br /> EMCON/OWT, Inc. (EMCON/OWT) to prepare a new Storm Water Pollution <br /> Prevention Plan (SWPPP), to control potential release throughout closure <br /> construction. The SWPPP recommends staged construction of the final cover <br /> system,and the use of nine erosion control measures, using up to 14 Best <br /> Management Plans (BMPs), as generally correlated with an Erosion Control <br /> Base Map for the site. The SWPPP also requires regular weekly inspections of <br /> each BMP, and also inspections during extended storm events and fbilowing <br /> rainfall events,which result in runoff- Each inspection must note needed <br /> maintenance, repairs, and effectiveness of each BMP. When deemed necessary, <br /> changes to improve sediment control must be identified for implementation. <br /> The initial phase of construction includes the following BMPs for control of <br /> sediment: <br />
The URL can be used to link to this page
Your browser does not support the video tag.