Laserfiche WebLink
being extended but not the pump's tubing. Forward has extended the pump in well MW-lA <br /> which will be sampled in November during the fourth quarter 2006 sampling event. <br /> The results of water quality analyses completed for surface-water monitoring stations are <br /> generally consistent with previous results. During the third quarter 2006 monitoring period, only <br /> pH values were measured outside the range of CLs in surface water samples. With the exception <br /> of turbidity in all three surface-water samples, no statistically significant increasing trends were <br /> noted. <br /> The final closure construction work for the French Camp Landfill has been completed, and the <br /> final construction quality assurance report will be submitted to the regulatory agencies by early <br /> to mid November 2006. <br /> If you have any questions regarding this report,please call me at(858)451-1136. <br /> Sincerely, <br /> �1 t, <br /> William B. Lop z, G, CHg <br /> Project Geologi <br /> Attachment <br /> CA2003-021WcswnHr svm06.doc <br /> ®2® <br /> Geologic Associates <br />