Laserfiche WebLink
oPquly,,.o <br /> 2.' <br /> A� COUNTY OF SAN JOAQUIN <br /> Y •,Z{ EUGENE DELUCTOR <br /> DEPARTMENT OF PUBLIC WORKS CHIEF DEPUTY DIRECTOR <br /> e'. _ :• <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE THOMAS R.FLINN <br /> -__ STOCKTON.CALIFORNIA 95201 DEPUTY DIRECTOR <br /> (209)468-3000 MANUEL LOPEZ <br /> F 0 R� FAX(209)468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> January 14, 1994 <br /> Scott Walker <br /> California Integrated Waste <br /> Management Board <br /> 8800 Cal Center Drive <br /> Sacramento, CA 95826 <br /> Subject: HARNEY LANE SANITARY LANDFILL <br /> FINAL CLOSURE AND POSTCLOSURE <br /> MAINTENANCE PLANS <br /> Dear Mr. Walker: <br /> This is in response to the California Integrated Waste Management <br /> Board (CIWMB) letter dated November 29, 1993, regarding the Final <br /> Closure and Postclosure Maintenance Plans for the Harney Lane <br /> Sanitary Landfill . The CIWMB letter included comments from the <br /> Regional Water Quality Control Board (RWQCB) and the Local <br /> Enforcement Agency (LEA) . The County responded to the RWQCB <br /> comments separately in a letter dated December 15, 1993 . Copies of <br /> this letter and attachments were sent to the CIWMB and the LEA. <br /> Responses to CIWMB and LEA comments are shown below. Some of the <br /> responses require Closure andtor Postclosure Plan revisions. <br /> Revised text is attached. Please replace old text in your copies <br /> with the revised text. <br /> B® COMMENTS <br /> Comment 1: <br /> "Final cover Construction Quality Assurance (CQA) issues to be <br /> addressed are summarized in five comments provided in the Regional <br /> Water Board letter dated October 18, 1993 . Board and LEA staff <br /> defer resolution of CQA issues to the Regional Water Board at this <br /> time. Revision of CQA documentation and inclusion of test pad <br /> results to address these comments should be incorporated in revised <br /> final plans. " <br />