Laserfiche WebLink
® • <br /> The purpose of this evaluation monitoring program is to address this concern. This <br /> evaluation monitoring program was prepared consistent with the WDR Order No. 93-200 <br /> and Section 2550.9 of Article 5. This report was prepared by EMCON Associates <br /> (EMCON) on behalf of San Joaquin County. The remainder of the report is divided into <br /> two sections. Section 2 provides a background section on the detection of PCE in well <br /> MW-2. Section 3 describes the proposed evaluation monitoring program. <br /> SAC/pjOW939ID9390011.8a1-94/lfc:9 Rev.0, 10/17/94 <br /> 0939-001.18 2 <br />