Laserfiche WebLink
0 SECTION 5 <br /> Special <br /> (8/94) <br /> 5-1 . 14 AS-BUILT DRAWINGS . --The Contractor shall keep on <br /> the work site a current copy of the drawings and specifications <br /> and shall at all times give the Owner access thereto. <br /> The Contractor will be given five sets of drawings and <br /> specifications. One set of drawings and specifications shall be <br /> kept at the site of the work at all times and updated weekly. <br /> Payment may be withheld if drawings are not kept current . Exact <br /> elevations of the finished grading plane of the foundation layer <br /> and the clay barrier layer shall be recorded and shown at <br /> loo-feet intervals in each direction (grid) ) on the as-built <br /> drawings . Upon completion of the work, the as-built drawings and <br /> specifications shall be returned to the owner prior to final <br /> payment . <br /> Full compensation for completing the as-built drawings and <br /> specifications shall be considered as included in the prices paid <br /> for the various contract items of work, and no additional <br /> compensation will be allowed therefor. <br /> V:\SPEC-00.WX\HLSL-S.S 5-5 <br />