My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1994-1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1994-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 9:24:25 AM
Creation date
7/3/2020 11:08:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1994-1998
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1990-1994.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scott Walker <br /> January 14, 1994 <br /> Page 4 <br /> Response: <br /> Comment noted. The revised closure and postclosure maintenance <br /> plans include costs for off-site structure monitoring. <br /> Comment 2: <br /> "A gas control system work plan and cost estimates for the <br /> construction, operation, and maintenance of the gas control system <br /> must be addressed in a future revision of the closure and <br /> postclosure maintenance plans. The work plan may be submitted as <br /> an appendix to the plans. " <br /> Response: <br /> The County will submit a workplan and cost estimates with the final <br /> design of the landfill gas control system by the end of May 1994. <br /> Comment 3: <br /> "We are concerned about the extensive delay in the placement of the <br /> final cover due to test pad failure. The installation of the gas <br /> control system is dependent on final cover placement and is also <br /> delayed indefinitely." <br /> Response: <br /> The County is equally concerned about the delay in placement of <br /> final cover and construction of a gas control system. However, the <br /> County has acted expeditiously in preparing the original test pad <br /> and a subsequent test pad. The County submitted passing test pad <br /> results in the response to the RWQCB, dated December 15, 1993, <br /> (attached) . <br /> However, placement of final cover has not been delayed <br /> indefinitely. The County is prepared to proceed with closure <br /> activities in a timely manner upon approval of the Closure Plan. <br /> It is anticipated that placement of final cover will occur during <br /> the 1994 construction season. <br /> The County would like to expedite Closure Plan approval . As a <br /> result, we are willing to meet with CIWMB, RWQCB, and LEA staff to <br />
The URL can be used to link to this page
Your browser does not support the video tag.