My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1994-1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1994-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 9:24:25 AM
Creation date
7/3/2020 11:08:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1994-1998
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1990-1994.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scott Walker <br /> January 14, 1994 <br /> Page 3 <br /> Response: <br /> The County submitted preliminary plans for a landfill gas control <br /> system to the CIWMB, the RWQCB, and the LEA on April 30, 1993 . The <br /> LEA commented on the plans in a memo dated May 11, 1993, and the <br /> County responded with a memo dated June 9, 1993 . The County is in <br /> the process of finalizing the plans for the landfill gas control <br /> system. Final plans will be submitted to the CIWMB and the San <br /> Joaquin County Air Pollution Control District (SJAPCD) by the end <br /> of May 1994. Further, the County is proceeding with a Request for <br /> Statements of Interest (RSOI) for construction a gas-to-energy <br /> facility on-site. By mid-April 1994, the County will be able to <br /> determine whether a gas-to-energy facility or a flaring system will <br /> be installed. However, the landfill gas control system cannot be <br /> installed until final cover is in place. Therefore, The County <br /> requests approval of final cover design and construction procedures <br /> by February 28, 1993, to insure that the final cover will be placed <br /> during this construction season. <br /> Comment 4: <br /> "Cost estimates and financial assurances must be revised to reflect <br /> the above comments. " <br /> Response: <br /> Cost estimates have been revised in the Final Closure and <br /> Postclosure Maintenance Plans. Also, a copy of the financial <br /> assurance agreement is attached. Please insert this agreement in <br /> your copies of the Closure Plan as Appendix J - FINANCIAL ASSURANCE <br /> DOCUMENTATION. <br /> LEA COMMENTS <br /> Comment 1: <br /> "The methane gas monitoring for off-site structures and the <br /> associated costs for monitoring must still be addressed in revised <br /> closure and postclosure maintenance plans. " <br />
The URL can be used to link to this page
Your browser does not support the video tag.