Laserfiche WebLink
Mr. Steve Rosenbaum Project P94-030.35 <br /> May 5, 1994 <br /> Page 3 <br /> Task 3 - Reporting <br /> Following the completion of Task 2, EMCON will prepare a report documenting the <br /> results of the investigation. The objective of the report will be to determine the source for <br /> the impacts to groundwater detected in monitoring well MW-4. The report will provide <br /> the following information: <br /> • Summary of the historical groundwater data from the monitoring system at the <br /> waste water treatment facility <br /> • Site location map showing the location of the landfill, <br /> percolation/infiltration ponds and the groundwater monitoring wells <br /> • Groundwater contour maps showing direction of groundwater flow <br /> • Construction details and effluent inflow data from the <br /> evaporation/infiltration ponds <br /> • Groundwater analytical results <br /> • Statistical evaluation of the groundwater analytical data <br /> • A summary and discussion of the findings <br /> Schedule <br /> The proposed schedule to complete the proposed scope of work is shown below. The <br /> sampling and analytical portions of Task 2 have been scheduled to coincide with the third <br /> quarter landfill monitoring event. <br /> Task Task Description Start Date End Date <br /> 1 Data Review and Analysis 04/16/94 0620/94 <br /> 2 Additional Data Collection and 08/01/94 09/02/94 <br /> Evaluation (coincides with quarterly <br /> monitoring event) <br /> 3 Reporting 09/02/94 09/30/94 <br /> SAGI:NVro\p94\p9403035.arn-94 mam:2 <br />