Laserfiche WebLink
Al Olsen <br /> May 13, 1994 <br /> Page 2 <br /> Response• <br /> The County is in the process of hiring a consultant to perform the <br /> required sampling and analysis. The work will be performed by May <br /> 30, 1994. <br /> Comment 3 • <br /> "Labor camp structure methane monitoring reports shall be submitted <br /> to the EHD within fifteen days of sample collection. The Calderon <br /> Air SWAT compounds sampling results shall be submitted to the EHD <br /> by June 30, 1994. 11 <br /> Response• <br /> The monitoring results will be submitted within 15 days as <br /> requested. <br /> If you have any questions, please call me or Gabriel Karam at <br /> Extension 83066. <br /> TH:WJ:vj <br /> R: \VIRGINIA\MEMOS\HL-GAS.AO1 <br /> Enclosure <br /> LA 11458 <br />