My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1994-1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1994-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 9:24:25 AM
Creation date
7/3/2020 11:08:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1994-1998
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1990-1994.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> COUNTY JAUIN <br /> Z'- � '•,Z EUGENE DELUCCHI <br /> DEPARTMENT OF PUBLIC WORKS CHIEF DEPUTY DIRECTOR <br /> ®. ,'• P.O.BOX 1810-1810 E.HAZELTON AVENUE THOMAS R.FLINN <br /> STOCKTON,CALIFORNIA 95201 DEPUTY DIRECTOR <br /> (209)468-3000 MANUEL LOPEZ <br /> FAX(209)468-2999 DEPUTY DIRECTOR <br /> HENRY M.HIRATA <br /> DIRECTOR <br /> 'PUY <br /> MAY ,9 t <br /> 994 <br /> May 17, 1994 RO i„,. <br /> �,1LlV�, ._, <br /> N�1 II<�.lVrd.,tibAL7H <br /> PERMIT 1 SERVICES <br /> M E M O R A N D U M <br /> TO: Ed Padilla, SREHS <br /> Public Health Services <br /> Environmental Health Division <br /> FROM: Gabriel Karam, P.E. a.K% <br /> Senior Solid Waste Engineer <br /> SUBJECT: LANDFILL GAS MONITORING AT THE <br /> HARNEY LANE SANITARY LANDFILL <br /> Enclosed is the sixth quarterly Landfill Gas Monitoring Report for <br /> the Harney Lane Sanitary Landfill . The perimeter gas monitoring <br /> wells and labor camp structures were monitored for methane as <br /> required. Perimeter gas probe monitoring will continue on a <br /> quarterly basis. Labor camp monitoring will be performed monthly <br /> from May - October and quarterly from November - April as requested <br /> by the San Joaquin County Department of Public Health Services. If <br /> you have any questions, please call me at Extension 83066. <br /> GK:WJ:vj <br /> R: IVIRGINIAIMEMOSIGASMON11 .EP <br /> Enclosure <br /> c: Brad Williams, California Integrated <br /> Waste Management Board <br /> LA 11458 <br />
The URL can be used to link to this page
Your browser does not support the video tag.