Laserfiche WebLink
0 0 <br /> STRUCTURE MONITORING <br /> In accordance with the letter from the San Joaquin County Public <br /> Health Services dated April 5, 1994, structure monitoring at the <br /> Farm Labor Camp is being performed monthly from May - October. <br /> The results from this monitoring are being submitted separately. <br /> ON SITE STRUCTURES <br /> The scale house was removed from the site in December, 1992 . The <br /> office/maintenance shed was monitored for methane on 8\11\94 The <br /> methane reading was approximately 40 ppm. Monitoring will <br /> continue on a quarterly basis. <br /> R: \WES\EN\HL\GASMONRE.Pll <br /> LA 11458 <br />