Laserfiche WebLink
i <br /> The structures were occupied by farm workers during this event. <br /> It should be noted that a strong odor of cleaning products was <br /> encountered in all structures. In addition, many of the <br /> occupants were using the gas stoves at the time of the <br /> monitoring. <br /> Structure monitoring of the farm labor camp will continue on a <br /> quarterly basis. The next monitoring event is scheduled late <br /> October, 1993 . <br /> ON SITE STRUCTURES <br /> The scale house was removed from the site in December, 1992 . The <br /> office/maintenance shed was monitored for methane on 8\25\93 The <br /> methane reading was approximately 20 ppm. Monitoring will <br /> continue on a quarterly basis. <br />