Laserfiche WebLink
STRUCTURE MONITORING <br /> On November 1, 1993 , San Joaquin County performed the fourth <br /> quarterly labor camp monitoring event. Present during monitoring <br /> ' were Wes Johnson of the County Solid Waste Division, and Carlos <br /> of the Housing Authority. <br /> The equipment used was a Gas Tech Landfill Monitor equipped with <br /> parts per million (ppm) , Lower Explosive Limit (5%) , and 100% gas <br /> ' scales. The ppm scale was used for structure monitoring. The <br /> instrument was calibrated with a 2 . 5% methane mixture and was <br /> warmed up for approximately 10 minutes prior to monitoring. The <br /> methane level in open air at the labor camp was approximately 30 <br /> ppm- <br /> Each Each building contains two apartments. Monitoring consisted f a <br /> complete walk-through of each apartment with an emphasis on <br /> incoming plumbing, electrical outlets, baseboards, behind stoves, <br /> and cracks (if encountered) . In addition, vents on the roofs of <br /> two buildings were monitored. <br /> Results of the structure monitoring are shown on Table 2. <br /> Similar to previous monitoring events, fifteen structures were <br /> monitored. The first 12 structures listed on table 2 are along <br /> ' the east edge of the labor camp from north to south. Structures <br /> 13-15 are along the north edge from east to west. <br />