Laserfiche WebLink
Structure monitoring of the farm labor camp will continue on a <br /> quarterly basis. The next monitoring event is scheduled for <br /> January, 1993 . <br /> ON SITE STRUCTURES <br /> The scale house was removed from the site in December, 1992 . The <br /> office/maintenance shed was monitored for methane on 11\1\93 The <br /> methane reading was approximately 30 ppm. Monitoring will <br /> continue on a quarterly basis. <br />