Laserfiche WebLink
3 .4 Litter <br /> The site is no longer accepting waste, so litter is mainly <br /> controlled by maintaining proper cover soil over the entire site <br /> and maintaining perimeter fencing. Also, landfill workers help <br /> keep the area free of litter. <br /> 3 . 5 Fires <br /> Any fires that occur will be controlled by landfill personnel using <br /> stockpiled cover material and the water truck. In addition, all <br /> landfill structures contain fire extinguishers to control any small <br /> fires that may occur within the structures. <br /> 3 . 6 Landfill Gas <br /> A landfill gas monitoring system was installed at the Harney Lane <br /> Sanitary Landfill in October 1991. See section 15, page 14, of this <br /> report for information about the landfill gas monitoring system. <br /> 4. 0 CLOSURE IMPLEMENTATION SCHEDULE <br /> The Pre-closure and Closure Operations schedule is shown on figure <br /> 2, and consists of the following tasks. <br /> • Finalize foundation layer <br /> • Place clay barrier layer, <br /> • Place vegetative layer <br /> • Hydroseeding <br /> • Finalize drainage facilities <br /> • Decommission structures <br /> • Install Gas Control System <br /> 5 <br />