Laserfiche WebLink
Table for additional compaction cost for clay cover <br /> EQUIPMENT EQUIP. OPER LABOR PRODUCTION COST/C.Y. <br /> $ $ C.Y./HR $ <br /> Compactor 14 . 68 23 .58 49 0.78 <br /> Water Truck 5. 38 23 .58 108 0.27 <br /> Grader 14 . 38 23 .58 866 0. 04 <br /> Supervision 30. 00 650 0. 05 <br /> COMPACTION UNIT COST $1.14/C.Y. <br /> 1. FINAL COVER COSTS <br /> a. Foundation: <br /> ($1.75 X 161,333 CY) _ $282,333 <br /> b. Clay Barrier: <br /> ($1.75 X 161, 333 CY) _ $282, 333 <br /> AMIL C. Vegetative: <br /> ($0. 61 X 161,333 CY) _ $ 98,413 <br /> d. Clay Import Cost <br /> ($ 7. 50/CY x 32,266 CY) _ $242 , 000 <br /> $905, 079 <br /> 2.0 CONSTRUCTION QUALITY ASSURANCE <br /> All work to affect the program will be done in accordance with the <br /> CQA program (Appendix C) . The CQA program explains all testing to <br /> be performed in accordance with Title 14, Chapter 3 , Article 7. 8, <br /> Section 17774. The CQA cost estimate below is derived from the <br /> contract for CQA between San Joaquin County and Kleinfelder, Inc. . <br /> Total Construction Quality Assurance Cost = $160, 000 <br /> Is <br /> 18 <br />