My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 7:08:21 AM
Creation date
7/3/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994_1
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
665
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 REVEGETATION <br /> The landfill and two soil borrow sites will require revegetation <br /> (153 acres total) . Approximately 100 acres of landfill area will <br /> be revegetated. The borrow sites are approximately 33 and 20 acres <br /> (see sheet 4) . The vegetative layer will be 1. 0 foot thick for the <br /> landfill area and will be planted with Bromme grass which should <br /> not require irrigation. <br /> The following assumptions are made for estimating costs: <br /> * Seeding will be accomplished by hydroseeding for the landfill <br /> areas. <br /> * The maximum seeding rate will be 40 pounds per acre <br /> * Fertilizer will be applied at a rate of 400 pounds/acre. <br /> * Mulch will be applied at a rate of 1500 pounds/acre. <br /> * All costs below include labor <br /> 3 . COST <br /> Landfill: <br /> a. Seed @ 40 pounds per acre <br /> ($12.50/lb X 40 X 153) _ $ 76,500 <br /> b. 16-20-0 fertilizer @ $200 per acre <br /> ($.50/lb X 400 X 153) _ $ 30, 600 <br /> C. Mulch @ $300/acre = <br /> ($.20/lb X 1500 X 153) _ $ 45,900 <br /> Total Revegetation $153, 000 <br /> 4. 0 LANDFILL GAS MONITORING AND CONTROL <br /> Landfill gas monitoring has indicated that methane levels are above <br /> regulation limits at the perimeter of the landfill. A control <br /> system will be installed following construction of the final cover. <br /> The gas collected would either be sold or flared off, depending on <br /> the market. The estimated cost to design and install a gas <br /> collection and flaring system at the Harney Lane Sanitary Landfill <br /> is $400, 000. The estimated cost for methane monitoring of the <br /> perimeter wells and off site structures for the closure period is <br /> $10,000. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.