Laserfiche WebLink
9.0 STRUCTURE REMOVAL <br /> The metal maintenance building is the only structure remaining at <br /> the site. This metal building will be removed for reuse at another <br /> site. The foundation for the metal building will removed and taken <br /> to another. <br /> COST <br /> Structures: Move metal building <br /> (Lump Sum estimate) $2 , 000 <br /> Foundation removal: Demolition and removal <br /> (lump Sum Estimate) = 1, 500 <br /> $3,500 <br /> 10.0 DISMANTLING ENVIRONMENTAL CONTROLS <br /> The gas probes that were existing from the SWAT have been <br /> decommissioned as explained in section 6. 0 of the Final Closure <br /> lmftPlan. No other decommissioning of environmental control systems is <br /> needed during the closure period. <br /> 22 <br />