7.0 DRAINAGE SYSTEM INSTALLATION <br /> Most of the drainage facilities have been constructed and are in <br /> place. All major drainage features have been constructed except <br /> for the top cover final ditches. All of the metal pipe downdrains <br /> have been installed. The downdrains only have to be adjusted to <br /> final grade. <br /> There is approximately 9,000 lineal feet of top cover V shaped <br /> drainage ditches to be constructed. The storm drainage detention <br /> basin has been partially excavated for daily cover and the cost for <br /> excavation is included in the cover material placement costs. <br /> COST <br /> Downdrains: Adjust 19 downdrains to final grade. <br /> ($200 X 19) _ $ 3 ,800 <br /> Top Cover Ditch Grading: Construction crew at $1,500 per <br /> day. It is estimated that 500 lineal feet of V drainage <br /> ditch could be built a day. A crew would consist of a <br /> motorgrader, scraper, 2 operators, 1 laborer, and 1 grade <br /> setter. Staking and engineering have been included in <br /> cover placement cost. <br /> qP ($1, 500 X 9,000/500) = 27 000 <br /> TOTAL $30,800 <br /> 8. 0 ADDING OR REMOVING SECURITY SYSTEMS <br /> The current perimeter fencing is appropriate for closure security <br /> in the landfill area and the detention basin. The necessary <br /> closure and notice signs and locks are estimated to cost $1, 000. <br /> Maintenance road: Approximately 2, 100 lineal <br /> feet of 10 foot wide all weather patrol road will be <br /> constructed to the basin pumps. Assume approximately $5. 00 <br /> per foot of road. <br /> ($5 X 2 , 100) _ $101, 500 <br /> Locks and signs = $ 1, 000 <br /> $11,500 <br /> 21 <br />