My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1994_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1994_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 7:08:21 AM
Creation date
7/3/2020 11:08:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1994_1
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1994_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
665
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.0 DRAINAGE SYSTEM INSTALLATION <br /> Most of the drainage facilities have been constructed and are in <br /> place. All major drainage features have been constructed except <br /> for the top cover final ditches. All of the metal pipe downdrains <br /> have been installed. The downdrains only have to be adjusted to <br /> final grade. <br /> There is approximately 9,000 lineal feet of top cover V shaped <br /> drainage ditches to be constructed. The storm drainage detention <br /> basin has been partially excavated for daily cover and the cost for <br /> excavation is included in the cover material placement costs. <br /> COST <br /> Downdrains: Adjust 19 downdrains to final grade. <br /> ($200 X 19) _ $ 3 ,800 <br /> Top Cover Ditch Grading: Construction crew at $1,500 per <br /> day. It is estimated that 500 lineal feet of V drainage <br /> ditch could be built a day. A crew would consist of a <br /> motorgrader, scraper, 2 operators, 1 laborer, and 1 grade <br /> setter. Staking and engineering have been included in <br /> cover placement cost. <br /> qP ($1, 500 X 9,000/500) = 27 000 <br /> TOTAL $30,800 <br /> 8. 0 ADDING OR REMOVING SECURITY SYSTEMS <br /> The current perimeter fencing is appropriate for closure security <br /> in the landfill area and the detention basin. The necessary <br /> closure and notice signs and locks are estimated to cost $1, 000. <br /> Maintenance road: Approximately 2, 100 lineal <br /> feet of 10 foot wide all weather patrol road will be <br /> constructed to the basin pumps. Assume approximately $5. 00 <br /> per foot of road. <br /> ($5 X 2 , 100) _ $101, 500 <br /> Locks and signs = $ 1, 000 <br /> $11,500 <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.