Laserfiche WebLink
kn KLEINFELDER <br /> 5 CONSTRUCTION CONTROL . 16 <br /> 5.1 Stoppage of Work 16 <br /> 5.2 Grade Control 16 <br /> 5.3 Quality Control 17 <br /> 6 CONSTRUCTION 18 <br /> 6.1 Test Pad 18 <br /> 6.2 Construction of the Final Cover 18 <br /> 6.2.1 Foundation Layer 18 <br /> 6.2.2 Barrier Layer 19 <br /> 6.2.3 Vegetative Layer 21 <br /> 6.3 Results from Test Pad 21 <br /> 7 QA/QC TESTING AND MONITORING 23 <br /> 7.1 General 23 <br /> 7.2 QA/QC Testing 23 <br /> 7.3 Construction Monitoring 23 <br /> 8 DOCUMENTATION 25 <br /> 9 NONCONFORMANCE 27 <br /> 10 MEETINGS 28 <br /> TABLES <br /> 2-1 Borrow Area Soil Test Summary <br /> 7-1 Clay Borrow Material <br /> 7-2 Construction Monitoring Test Methods <br /> 7-3 Frequency of Field and Laboratory Testing <br /> 7-4 Pass/Fail Criteria <br /> FIGURES <br /> 3-1 Organization Chart <br /> APPENDICES <br /> A. Regulatory Requirements <br /> B. Project Team Resumes <br /> C. Kleinfelder Standard Forms <br /> GSM.md 3EI94 Page iv of iv <br /> Copyright 1994 Kleinfelder, Inc. <br />