My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:54:32 AM
Creation date
7/3/2020 11:08:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> The CQA Plan is meant to supplement the Closure Plan developed by the SJDWP, and as such <br /> the SJDPW will serve as engineer for the final cover project. <br /> ® 1.4 DEFINITIONS <br /> This section defines terms used in this QA/QC plan. <br /> Barrier layer - The low permeability layer of the final cover, also referred to as "clay" layer. <br /> Construction Quality Assurance Monitor - Also referred to as the "Monitor" or "QA/QC <br /> Monitor" or "QA/QC Technician." The firm or individual responsible for performing the <br /> third party tasks as specified in this document. Kleinfelder Inc will serve a third parry CQA <br /> Monitor. <br /> Design Engineer - SJDPW will be responsible for the design and preparation of the project <br /> construction drawings. <br /> E - The firm or individual responsible for performing the QA/QC tasks as specified in <br /> this document. <br /> Earthwork - An activity involving the use of soil materials as defined in the Closure Plan. <br /> Earthwork Contractor - Also referred to as the "Contractor." The person or firm responsible <br /> for earthwork related activities. This definition applies to any party performing work defined <br /> as earthwork even if not his primary function. <br /> Foundation layer - The bottom soil layer of the final cover directly above the landfill waste <br /> which is engineered and constructed to form a base for construction of the low permeability <br /> barrier layer. <br /> e t - County of San Joaquin <br /> project Construction Drawings and Specifications - Includes all project related drawings and <br /> specifications including design modifications and record drawings. <br /> Pr�ect Documents - Construction drawings, record drawings, specifications, shop drawings, <br /> construction quality assurance and quality control plans, safety plan, and project schedule. <br /> Prpject Manager - The official representative of the SJDPW responsible for construction of the <br /> project. <br /> QA/QC - Quality Assurance and Quality Control <br /> ality Assurance - Verification that quality control functions have been adequately and <br /> correctly performed. <br /> Quality Control - Functions performed to verify that work done conforms to the drawings and <br /> specifications. <br /> GSM.-MD 3EI94 Page 3 of 24 <br /> Copyright 1994 Kleinfelder, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.