My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 3:54:32 AM
Creation date
7/3/2020 11:08:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1995
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_1995.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> vi. The sampling documentation <br /> vu. The sample reporting <br /> 3. With respect to laboratory testing, set forth: <br /> i. The laboratory test procedure <br /> ii. The laboratory test documentation <br /> iii. The laboratory test reporting <br /> 4. With respect to field testing, set forth: <br /> i. The field test procedure <br /> ii. The pattern of field testing <br /> iii. The frequency of field testing <br /> iv. The documentation of field testing <br /> V. the reporting of field tests <br /> 5. Set forth the required contractor briefings. <br /> 6. Establish responsibility for Survey control of the work. <br /> 7. Set forth the forms and other documentation required, and the method of <br /> keeping, maintaining and distributing records so that successful progress of the <br /> project can be demonstrated. <br /> 1.3 BACKGROUND <br /> The Harney Lane Sanitary Landfill, hereinafter "Landfill" is a Class III Sanitary Landfill <br /> owned by San Joaquin County and operated under Solid Waste Facilities permit No. <br /> 39-AA-003 and Waste discharge Requirement Order Number 87-088. <br /> The SJDPW submitted the Closure Plan to the California Integrated Waste Management Board <br /> (CIWMB) and received detailed review comments from the Local Enforcement Agency' <br /> (LEA), the Central Valley Regional Water Quality Control Board (RWQCB) and the CIWMB <br /> dated August 5, 1991. Among the comments by the agencies, the RWQCB recommended <br /> third parry Construction Quality Assurance (CQA) for construction of the final cover by the <br /> County. This CQA plan includes QA/QC monitoring by Kleinfelder as a third party for the <br /> final cover project. The CQA plan defines the roles of the different parties and the QA/QC <br /> measures proposed to satisfy Title 14, Section 17774. <br /> GSM:md 3EI94 Page 2 of 24 <br /> Copyright 1994 Kleinfelder, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.