Laserfiche WebLink
kn KLEINFELDER <br /> • report any activities which are adverse to the overall quality of the project and any <br /> nonconformances which are recurring even though resolution is readily achievable, <br /> • document observations and test results, and <br /> • document nonconformances and transmit documentation to the Chief QC Technician. <br /> 3.2.8 Construction Forces <br /> SJDPW will hire an outside earthwork contractor to perform construction of the final cover. <br /> The outside contractor will have experience of at least three years, which includes successful <br /> previous construction of at least two landfill or surface impoundment liners or caps to meet <br /> requirements of Chapter 15 involving mixing of imported clay or bentonite. <br /> 3.3 PROFESSIONAL QUALIFICATIONS <br /> 3.3.1 General Professional Qualifications <br /> The Project Engineer and Engineer of Record will be a Civil Engineer registered in the State <br /> of California. The CQA Officer shall be a Civil Engineer, registered in the State of <br /> California with a minimum of five years experience as a soil engineer. <br /> The QC Technician(s) shall have a minimum of two years experience as a soil technician <br /> working in the field. <br /> 3.3.2 PROJECT TEAM QUALIFICATIONS <br /> The resumes of the_project team members named in the organizational chart are in Appendix <br /> B. <br /> GSM.md 3EI94 Page 12 of 24 <br /> Copyright 1994 Kleinfelder,Inc. <br />