Laserfiche WebLink
kn KLEINFELDER <br /> File No. 20-1008-49.001 <br /> August 19, 1994 <br /> SUMMARY OF SECOND TEST PAD RESULTS <br /> HARNEY LANE LANDFILL <br /> SAN JOAQUIN COUNTY, CALIFORNIA <br /> INTRODUCTION <br /> At your request, Kleinfelder, Inc. provided testing and observation services at the secondary <br /> landfill site located on the south side of Harney Lane approximately 1 mile east of Jack Tone <br /> Road. The purpose of our observations was to serve as a third party Construction Quality <br /> Assurance (CQA) monitor during a second test pad construction in both single and double lift <br /> construction. <br /> PREVIOUS REPORTS <br /> The following previous reports have been submitted by Kleinfelder for the Harney Lane landfill <br /> closure: <br /> • "Construction Quality Assurance Plan for Construction of Final Cover, Hamey <br /> Lane Sanitary Landfill, San Joaquin County, California," dated December 5, <br /> 1991, File No. 20-1008-49. <br /> • "Construction Specifications for Test Pad, Hamey Lane Landfill, San Joaquin <br /> County, California," dated December 8, 1992, File No. 20-1008-49. <br /> • "Summary of Test Pad Results, Hamey Lane Landfill, San Joaquin County, <br /> California," dated July 8, 1993. <br /> • "Assessment of Sideslope Infiltration, Harney Lane Landfill, San Joaquin <br /> County, California," dated April 1, 1994. <br /> • "Response to Letter from California Regional Water Quality Control Board, <br /> Hamey Lane Landfill/Test Pad Results, San Joaquin County, California," dated <br /> November 11, 1993. <br /> • "Revised Construction Quality Assurance Plan for Construction of Final Cover, <br /> Hamey Lane Sanitary Landfill, San Joaquin County, California," dated June 1, <br /> 1994. <br /> GSM:md 13/94 <br /> Copyright 1994 KLeinfetder, Inc. Page 1 of 7 <br />