Laserfiche WebLink
File No. 20-1008-49.001 KLEI N FELDER <br /> August 19, 1994 <br /> Page 2of3 <br /> SUMMARY OF FIELD DENSITY TEST RESULTS <br /> Depth From Dry Laboratory Specified <br /> Test Finished Moisture Density Compaction Relative Relative <br /> No. Date Test Location Subgrade(ft.) %Dry Wt. P.C.P. Curve No. Compaction Compaction <br /> WEST HALF (continued) <br /> 15 08-02 N 1187 & E 1136 FSG 12.6 119 3 96 95 <br /> 16 08-02 N 1187 & E 1136 FSG 13.2 118 3 95 95 <br /> 17 08-02 W 1144 & E 1126 FSG 13.3 115 3 92 95 <br /> 18 08-02 N 1144 & E 1126 FSG 13.1 119 3 96 95 <br /> 19 08-02 Retest #17 11.5 119 3 95 95 <br /> 20 08-02 N 1108 & E 1126 FSG 11.9 121 3 97 95 <br /> 21 08-02 N 1074 & E 1117 FSG 13.3 117 3 94 95 <br /> 22 08-02 Retest #21 13.9 117 3 94 95 <br /> RETEST EAST HALF <br /> 23 08-02 Retest #8 10.9 120 3 96 95 <br /> 24 08-02 Retest #9 12.9 121 3 97 95 <br /> 25 08-02 Retest #10 12.0 120 3 96 95 <br /> 2 08-02 Retest #11 12.6 119 3 96 95 <br /> 2VW 08-02 Retest #12 13.0 116 3 93 95 <br /> WEST HALF CUT 6 INCH <br /> 28 08-02 N 1225 & E 1138 -0.5 13.6 114 3 92 95 <br /> 29 08-02 N 1187 & E 1136 -0.5 14.5 112 3 90 95 <br /> 30 08-02 N 1144 & E 1126 -0.5 14.2 114 3 91 95 <br /> 31 08-02 Retest #30 13.6 114 3 92 95 <br /> 32 08-02 N 1108 & E 1126 -0.5 11.2 122 3 98 95 <br /> 33 08-02 N 1074 & E 1117 -0.5 15.0 117 3 94 95 <br /> 34 08-02 Retest #33 15.1 116 3 93 95 <br /> RETEST EAST HALF <br /> 35 08-02 Retest #27 12.9 121 3 97 95 <br /> WEST HALF <br /> 36 08-02 N 1187 & E 1136 FSG 10.8 121 3 97 95 <br /> 37 08-02 Retest #29 -0.5 12.6 119 3 95 95 <br /> 38 08-02 N 1225 & E 1138 FSG 9.6 123 3 98 95 <br /> 39 08-02 N 1144 & E 1126 FSG 10.4 120 3 96 94 <br /> 40 08-02 N 1108 & E 1126 FSG 9.6 124 3 99 95 <br /> 41 08-02 Retest #22 11.4 120 3 96 95 <br /> 08-02 Retest #32 12.4 121 3 97 95 <br /> Accepted engineering and testing procedures were used for these tests. The above data is presented for information purposes only. In the absence of continuous observations of our personnel <br /> at the site,we cannot express an opinion as to the adequacy of site preparation or overall fill compaction. We do not undertake the guarantee of construction,nor do we relieve the contractor <br /> of his primary responsibility to produce a completed project conforming to the project plans and specifications. Copyright 1994 Kleinfelder,Inc. <br />