Laserfiche WebLink
File No. 20-1008-49.001 K L E I N FELDER <br /> August 19, 1994 <br /> Page 3 of 3 <br /> SUMMARY OF FIELD DENSITY TEST RESULTS <br /> Depth From Dry Laboratory Specified <br /> Test Finished Moisture Density Compaction Relative Relative <br /> No. Date Test Location Subgrade(ft.) %Dry Wt. P.C.P. Curve No. Compaction Compaction <br /> WEST SIDE TOP (continued) <br /> 43 08-02 Retest #31 12.6 119 3 95 95 <br /> 44 08-02 Retest #28 13.5 120 3 96 95 <br /> 45 08-02 Retest #34 13.5 120 3 96 95 <br /> EAST HALF <br /> 46 08-02 N 1226 & E 1172 FSG 10.7 122 3 98 95 <br /> 47 08-02 N 1199 & E 1183 FSG 9.7 123 3 99 95 <br /> 48 08-02 N 1154 & E 1168 FSG 9.6 124 3 99 95 <br /> 49 08-02 N 1118 & E 1193 FSG 9.0 124 3 99 95 <br /> 50 08-02 N 1099 & E 1168 FSG 10.7 122 3 98 95 <br /> SC 08-02 N 1144 & E 1126 -0.5 13.1 119 3 95 95 <br /> Accepted engineering and testing procedures were used for these tests. The above data is presented for information purposes only. In the absence of continuous observations of our personnel <br /> at the site,we cannot express an opinion as to the adequacy of site preparation or overall fill compaction. We do not undertake the guarantee of construction,nor do we relieve the contractor <br /> of his primary responsibility to produce a completed project conforming to the project plans and specifications. Copyright 1994 Kleinfelder,Inc. <br />