Laserfiche WebLink
HYPOTHETICAL CORRECTIVE ACTION <br /> A corrective action response was developed to mitigate the impacts envisioned under the <br /> hypothetical release scenario. The extent and complexity of the corrective action <br /> response is proportional to the environment threat of the release and is consistent with the <br /> type and magnitude of corrective action mandated by the RWQB at the time this <br /> document was prepared. <br /> The corrective action envisioned is based on the following assumptions and premises: <br /> • The focus of the corrective action is source control. <br /> • The low level release of VOCs to groundwater will not require active <br /> groundwater cleanup (pump and treat, air sparging, etc.). This approach is <br /> justifiable given the remoteness of the landfill and absence of surrounding <br /> residences. <br /> • The performance objective of the corrective action is primarily to stop increases <br /> in VOC concentrations in groundwater and secondarily to reduce VOC <br /> concentrations in groundwater over time. <br /> Corrective action taken to mitigate the hypothetical release scenario will include the <br /> following activities: <br /> • Install a ten additional LFG collection wells, placed in coordination with the <br /> existing wells. The new wells will be designed to collect from the soil beneath <br /> the landfill, the deep waste and underlying vadose zone. <br /> • The depth of the wells will reach to the soil beneath the landfill approximately <br /> 15 feet. The total depth of each well (may be 100 feet, depending on the <br /> location of the well on the landfill. <br /> • These wells will be connected to the existing LFG header pipe through control <br /> valves. <br /> COST ANALYSIS <br /> The cost of the corrective action plan and EMP is approximately$410,000 (Table 1). <br /> The cost includes engineering design, field investigation, construction and associated <br /> materials, permitting, and final reports. Permitting associated with the project will <br /> include RWQCB and SJC well drilling permits. The total project cost was estimated at <br /> approximately. <br /> Corrective Action Financial Assurance Cost Estimate 4 May 25,2007 <br /> Harney Lane Sanitary Landfill San Joaquin County Public Works Department <br />