My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2005-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_2005-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 11:03:37 AM
Creation date
7/3/2020 11:09:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2005-2007
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440007_14750 E HARNEY_2005-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 Corrective Action Cost Estimate. <br /> Extended <br /> Item Quantity Unit Price Cost <br /> LFG System Enhancement <br /> Vertical LFG Wells (10 @ 100 ft ea) 1000 LF $130 $130,000 <br /> Lateral pipe on surface (10 @ 200 ft ea) 2000 LF $8.00 $16,000 <br /> Well head and connection 10 each $1,000 $10,000 <br /> LFG Extraction System Subtotal $156,000 <br /> Permits/Inspections <br /> RWQCB LS $4,000 <br /> Well Drilling Permit Fee LS $550 <br /> Inspections LS $500 <br /> Permits/Inspections Subtotal $5,050 <br /> EMP Work Plan and Implementation <br /> Professional and Technical Services LS $64,000 <br /> Driller Lab Surveyor Utility Clearance LS $130,000 <br /> EMP Work Plan and Implementation Subtotal $194,000 <br /> Engineering Design <br /> Professional and Technical Services LS $50,000 <br /> Final Report LS $5,000 <br /> Engineering Design Subtotal $55,000 <br /> Total Project Cost $410,050 <br /> LA 1103C <br /> N:\Miscellaneous\ClosCostEst\FinAssur&Costs\HL Correct Action RFR 5-25-07.doc <br /> Corrective Action Financial Assurance Cost Estimate 5 May 25,2007 <br /> Harney Lane Sanitary Landfill San Joaquin County Public Works Department <br />
The URL can be used to link to this page
Your browser does not support the video tag.