Laserfiche WebLink
Table 1 Corrective Action Cost Estimate. <br /> Extended <br /> Item Quantity Unit Price Cost <br /> LFG System Enhancement <br /> Vertical LFG Wells (10 @ 100 ft ea) 1000 LF $130 $130,000 <br /> Lateral pipe on surface (10 @ 200 ft ea) 2000 LF $8.00 $16,000 <br /> Well head and connection 10 each $1,000 $10,000 <br /> LFG Extraction System Subtotal $156,000 <br /> Permits/Inspections <br /> RWQCB LS $4,000 <br /> Well Drilling Permit Fee LS $550 <br /> Inspections LS $500 <br /> Permits/Inspections Subtotal $5,050 <br /> EMP Work Plan and Implementation <br /> Professional and Technical Services LS $64,000 <br /> Driller Lab Surveyor Utility Clearance LS $130,000 <br /> EMP Work Plan and Implementation Subtotal $194,000 <br /> Engineering Design <br /> Professional and Technical Services LS $50,000 <br /> Final Report LS $5,000 <br /> Engineering Design Subtotal $55,000 <br /> Total Project Cost $410,050 <br /> LA 1103C <br /> N:\Miscellaneous\ClosCostEst\FinAssur&Costs\HL Correct Action RFR 5-25-07.doc <br /> Corrective Action Financial Assurance Cost Estimate 5 May 25,2007 <br /> Harney Lane Sanitary Landfill San Joaquin County Public Works Department <br />