Laserfiche WebLink
migrant labor housing facility operated by San Joaquin County Housing Authority on the <br /> western portion of HLSL's property (Figure B-1). <br /> 2. Well Spacing <br /> The distance between the monitoring gas wells is less than 1000 feet (Table B-1). <br /> 3. Well Depths <br /> The depth of refuse is not certain, due to the operation of the landfill by others <br /> beginning in 1948; however, to the best knowledge of SWD, the perimeter <br /> migration monitoring wells extend to an elevation at or below the lowest extent of <br /> the waste fill. <br /> Shallow Probes allow monitoring from five to ten feet from the surface (Table B-2). <br /> Intermediate Probes allow monitoring at or near half the depth of refuse <br /> (Table B-2). <br /> Deep Probes allow monitoring at or near the depth of refuse (Table B-2). <br /> 4. Well Construction <br /> Soil gas wells were drilled by a licensed drilling contractor. During drilling, wells <br /> were logged and soil cuttings were characterized for visual classification during <br /> well installation (Attached). <br /> B. DESIGN CONSIDERATIONS <br /> HLSL's perimeter monitoring wells were designed based on the following site factors in <br /> accordance with Title 27, section 20923. <br /> 1. Local Soil and Rock Conditions <br /> Local soil and rock conditions did not require special design features for the soil <br /> gas wells. The soils immediately underlying the landfill consists of unconsolidated <br /> silts, clays, and sands to a depth of approximately 80 feet. The soils are typically, <br /> highly impermeable with hydraulic conductivities of approximately 10-6 to 10"6 <br /> centimeter/second. <br /> 2. Hydrogeologic Conditions <br /> The wells were installed in recognition of the hydro geologic conditions at the <br /> disposal site, which did not require special design features in the soil gas wells. <br /> Groundwater elevation ranges from -30 to -42 feet MSL (120 feet to 130 feet below <br /> Harney Sanitary Landfill County of San Joaquin <br /> Landfill Gas Monitoring Plan B-2 Department of Public Works <br /> Revised July 30,2009 Solid Waste Division <br />