My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3242
>
4400 - Solid Waste Program
>
PR0440068
>
COMPLIANCE INFO_2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2021 10:20:33 AM
Creation date
7/3/2020 11:10:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2010
RECORD_ID
PR0440068
PE
4434
FACILITY_ID
FA0001871
FACILITY_NAME
CALIFORNIA CLAY LANDFILL
STREET_NUMBER
3242
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17702029
CURRENT_STATUS
02
SITE_LOCATION
3242 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440068_3242 S EL DORADO_2008-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.5 PREVIOUS SITE INVESTIGATION AND REMEDIAL ACTIVITIES <br /> Cove Contractors is closing the landfill located at the site under the oversight of the RWQCB <br /> and the CIWMB. Several documents have summarized the activities conducted on site <br /> including documentation of the closure and post-closure activities. The document titled <br /> Revised Landfill Closure and Post-Closure Maintenance Plan [Clayton Group Services (Clayton), <br /> January 16, 2006] was approved by the CIWMB in a letter dated January 26, 2006 and by the <br /> RWQCB in a letter dated February 16, 2006. This plan described how the proposed landfill <br /> capping activities, groundwater monitoring, and landfill gas monitoring were an integral part of <br /> the post-closure maintenance procedures. <br /> Once landfill closure activities were completed a closure report was submitted to the RWQCB <br /> and CIWMB. This report was titled Landfill Closure Report Cove Contractors Facility 3242 South EI <br /> Dorado Street, Stockton Co (Condor Earth Technologies - September, 2007) detailing the <br /> earthwork, geotechnical oversight and quality assurance directly related to the construction of <br /> the landfill cover system based on the approved closure plan. Additional information regarding <br /> the closure activities was requested by the RWQCB and CIWMB. Therefore a supplemental <br /> report titled Closure Report Addendum Cove Contractors Facility 3242 South EI Dorado Street, <br /> Stockton, Ca (Miller Brooks - May 8, 2008) was submitted. This report described the ancillary <br /> closure activities associated with the installation of the landfill cap including monitoring well <br /> removal, monitoring well installation, landfill gas probe installation, hydroseeding, and <br /> implementation of site security. <br /> Closure and post-closure activities include the periodic groundwater and landfill gas monitoring <br /> events, as mentioned previously. Prior to the approval of the Revised Landfill Closure and Post- <br /> Closure Maintenance Plan, periodic soil and landfill gas investigations were conducted at the <br /> site beginning in 1986. However, regular monitoring events were conducted beginning in 2006. <br /> Clayton conducted all monitoring and landfill capping activities, from June 2006 through <br /> January 2007. Beginning in May 2007, Miller Brooks conducted all landfill capping and <br /> subsequent monitoring activities as required by RWQCB Waste Discharge Requirement (WDR) <br /> Order No. R5-2007-0084. Methane concentrations reported from the landfill gas probes located <br /> in the center of the site have generally remained the same or slightly increased over time. The <br /> majority of these concentrations have been above 5%. As described in following sections, <br /> perimeter gas probes were installed at the site in 2007. The majority of the methane <br /> concentrations reported from the perimeter gas probes have remained the some and have <br /> been below 5%,with the exception of two locations (PGP-1 and PGP-2). As discussed in Section <br /> 2.2, PGP-1 and PGP-2 are most likely reporting elevated methane concentrations due to their <br /> installation within the landfill footprint. <br /> 5 AMLLER MWOOKK <br /> P:\707 Cove Contractors\Feasibility Study and Corrective Action Plan\Corrective Action Plan_Final.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.