My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3242
>
4400 - Solid Waste Program
>
PR0440068
>
COMPLIANCE INFO_2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2021 10:20:33 AM
Creation date
7/3/2020 11:10:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2010
RECORD_ID
PR0440068
PE
4434
FACILITY_ID
FA0001871
FACILITY_NAME
CALIFORNIA CLAY LANDFILL
STREET_NUMBER
3242
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17702029
CURRENT_STATUS
02
SITE_LOCATION
3242 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440068_3242 S EL DORADO_2008-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
extend to depths consistent with the other perimeter gas probes at 9, 19, and 34 feet bgs. <br /> Boring logs, documenting soil lithology every 5ft,will be completed at each location. <br /> 4.3 LANDFILL GAS SAMPLING AND ANALYSIS <br /> 4.3.1 SAMPLING ACTIVITIES <br /> Approximately 3 filter pack volumes will be purged from each gas probe prior to sampling. Field <br /> analyses will be conducted for methane, carbon dioxide, pressures (both barometric and gas), <br /> and temperature (both ambient and gas) using a Landtec GEM 2000 landfill gas monitor, or <br /> equivalent. All results will be recorded on a landfill gas probe field form. <br /> Field sampling at all perimeter gas probes (PGP) will be increased from quarterly sampling <br /> events to monthly sampling events, as described above, until such time as the CIWMB and the <br /> RWQCB approve a reduction in monitoring. PGP-1 and PGP-2 will be maintained, monitored, <br /> and sampled as part of the field sampling program only. Laboratory analyses will continue to <br /> be conducted on a quarterly basis at perimeter gas probes PGP-1A, PGP-2A, PGP-3, PGP-4, <br /> PGP-5, and PGP-6 and all interior (TGP) landfill gas probe locations. Results will be included in <br /> the quarterly monitoring reports, as described in the Sample Collection and Analysis Plan (Miller <br /> Brooks, July 2007). <br /> 4.4 DATA EVALUATION <br /> Both the monthly field data and the quarterly field and laboratory landfill gas data will be <br /> compared to the regulatory criteria for methane. In addition, methane concentrations <br /> reported in PGP-1 and PGP-2 will be compared to the newly installed PGP probes (PGP-1 A and <br /> PGP-2A) located outside of the landfill perimeter. Perimeter gas probes reporting <br /> concentrations of methane 5% or greater will require immediate action by the Discharger as <br /> required in 27 CCR Section 20937. <br /> 4.4.1 VERIFICATION OF RELEASE <br /> In the event that methane concentrations greater than 5%are reported from the perimeter gas <br /> probes, Cove Contractors will follow the Reporting and Control of Excessive Gas Concentration <br /> requirements in accordance with 27 CCR Section 20937 (a) through (c). Including, but not <br /> limited to, the following requirements: <br /> • Immediately take all steps necessary to protect public health and safety and the <br /> environment and notify the Enforcement Agency (EA) by telephone or electronic <br /> means. <br /> • Within seven (7) days of detection of excessive landfill gas concentrations verify validity <br /> of results and place in the operating record a description of and submit a letter to the EA <br /> in accordance with 27 CCR Section 20937 (a)(2). <br /> 8 'SF AMLLEN NAW vas <br /> P:\707 Cove Contractors\Feasibility Study and Corrective Action Plan\Corrective Action Plan_Final.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.