Laserfiche WebLink
• Within 60 days of detection, implement a remediation plan approved by the EA and <br /> CIWMB for the methane gas releases in accordance with 27 CCR Section 20937 (a)(3). <br /> • Construct a gas control system that meets the criteria of §20939 in accordance with a <br /> design and in a manner approved for construction by the EA in coordination, if <br /> applicable,with the RWQCB. <br /> 9 AMLLEM HAWOMM <br /> P:\707 Cove Contractors\Feasibility Study and Corrective Action Plan\Corrective Action Plan_Final.doc <br />