Laserfiche WebLink
ATTACHMENT C <br />WASTE DISCHARGE REQUIREMENTS ORDER NO. R5-2007-0084 <br />COVE CONTRACTORS LANDFILL <br />SAN JOAQUIN COUNTY <br />Prior to installation of any monitoring well, the Discharger shall submit a workplan containing, <br />at a minimum, the information listed in Section 1, below. Wells may be installed after staff <br />approves the workplan. Upon installation of the monitoring wells, the Discharger shall submit a <br />well installation and analytical report, which shall include the information contained in Section <br />2, below. All workplans and reports must be prepared under the direction of, and signed by, a <br />registered geologist or civil engineer licensed by the State of California. <br />SECTION 1 - Monitoring Well Installation Workplan <br />A. General Information- <br />• Purpose of well installation project <br />• Copies of County Well Construction Permits (to be submitted after workplan <br />review) <br />• Monitoring well locations and rationale <br />• Survey details <br />• Equipment decontamination procedures <br />• Health and safety plan <br />• Topographic map showing any existing wells, proposed wells, waste handling <br />facilities, utilities, and other major physical and man-made features. <br />B. Drilling Details: <br />• Describe drilling technique <br />• Sampling intervals and logging methods <br />C. Monitoring Well Design: <br />• Casing diameter and centralizer spacing (if needed) <br />• Borehole diameter <br />• Depth of surface seal <br />• Well construction materials <br />• Diagram of proposed well construction details <br />• Type of well cap, bottom cap either screw on or secured with stainless steel <br />screws <br />• Size of perforations and rationale <br />• Grain size of sand pack and rationale <br />• Thickness and position of bentonite seal and sand pack <br />• Depth of well, length and position of perforated interval <br />D. Well Development: <br />• Method of development to be used <br />• Method of determining when development is complete <br />• Parameters to be monitored during development <br />• Method of development water storage and disposal <br />