My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3242
>
4400 - Solid Waste Program
>
PR0440068
>
COMPLIANCE INFO_2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2021 10:20:33 AM
Creation date
7/3/2020 11:10:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2010
RECORD_ID
PR0440068
PE
4434
FACILITY_ID
FA0001871
FACILITY_NAME
CALIFORNIA CLAY LANDFILL
STREET_NUMBER
3242
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17702029
CURRENT_STATUS
02
SITE_LOCATION
3242 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440068_3242 S EL DORADO_2008-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT C C-2 <br />WASTE DISCHARGE REQUIREMENTS ORDER NO. 0084 <br />COVE CONTRACTORS, INC. LANDFILL <br />SAN JOAQUIN COUNTY <br />E. Well Survey: <br />• Identify the Licensed Land Surveyor or Civil Engineer that will perform the survey <br />• Describe the well features to be surveyed (i.e. top of casing, vertical coordinates, <br />etc.) <br />• Vertical accuracy shall be to at least 0.01 foot <br />F. Well Sampling: <br />• Map showing each sample location and sample identification number <br />• Minimum time after development before sampling (48 hours) <br />• Well purging method and amount of purge water <br />• Table with sample containers, collection method, and preservation method <br />• Table with sample volumes, sample containers, preservation agents, and hold <br />times <br />• Tables with each analyte, analytical method, and practical quantitation limit <br />• Table with analysis to be performed at each sample location <br />• QA/QC procedures (field and laboratory) <br />G. Water Level Measurement: <br />The elevation reference point at each monitoring well shall be within 0.01 foot. <br />Ground surface elevation at each monitoring well shall be within 0.01 foot. <br />Method and time of water level measurement shall be specified. <br />H. Proposed time schedule for work. <br />SECTION 2 - Monitoring Well Installation and Analytical Report <br />A. Well Construction: <br />• Number and depth of wells drilled <br />• Date(s) wells drilled and completed <br />• Description of drilling and construction <br />• Scaled map of facility site features including monitoring wells, buildings, storage <br />ponds, waste piles, etc. <br />• A well construction diagram for each well must be included in the report, and <br />must contain the following details: <br />o Total depth drilled <br />o Drilling Contractor and driller name <br />o Depth of open hole (same as total depth drilled if no caving occurs) <br />o Method and materials of grouting excess borehole <br />o Footage of hole collapsed <br />o Length of slotted casing installed <br />o Depth of bottom of casing <br />o Depth to top of sand pack <br />o Thickness of sand pack <br />o Depth to top of bentonite seal <br />o Thickness of bentonite seal <br />
The URL can be used to link to this page
Your browser does not support the video tag.