• 0 <br />1 MONITORING WELL INSTALLATION WORKPLAN <br />A. GENERAL INFORMATION <br />• Purpose of the monitoring well installations will be conducted on behalf of Cove <br />Contractors, Inc, and will be conducted to further define the horizontal extent of <br />potential groundwater contamination as discussed in the Feasibility Study prepared <br />by Miller Brooks Environmental (Miller Brooks, March 8, 2010). Installation of monitoring <br />wells is at the direction of Ms. Mary Boyd of the Central Valley Regional Water Quality <br />Control Board. <br />• The site vicinity map is illustrated in Figure 1. <br />• Two groundwater monitoring wells will be installed along the north eastern boundary <br />of the Site. One monitoring well will be located north of PGP -6 and one will be <br />located south of PGP -6 and will be identified as MW -12 and MW -13, respectively (see <br />Figure 2). Depending on the access granted by Union Pacific Railroad Company, an <br />additional 2 monitoring wells will be installed beyond the eastern property boundary <br />within the railroad property. Installation activities will be conducted at least 25 from <br />the nearest track if possible (see Figure 2 for proposed installation locations). These <br />additional monitoring wells will be placed in the down gradient direction northeast of <br />the property boundary. The proposed locations are selected to intercept impacted <br />groundwater that may be migrating from the Site based on contaminant <br />concentrations in groundwater flow data related to the existing well network. <br />• After installation is complete, a licensed surveyor will survey the new monitoring well <br />locations, as described in Section E. <br />• Miller Brooks will obtain the necessary permits or authorizations from San Joaquin <br />County Department of Environmental Health prior to conducting the monitoring well <br />installations. Copies of permits will be provided to the RWQCB upon approval of the <br />workplan. <br />• To prevent potential cross -contamination, all drilling equipment will be <br />decontaminated by the drilling subcontractor in between boreholes. <br />• A site specific Health and Safety Plan is provided in Appendix A. <br />• In addition, a scaled map of the facility site features, including the proposed <br />monitoring well locations, is illustrated in Figure 2. <br />B. DRILLING DETAILS <br />• Gregg Drilling, Inc., located in Martinez, California, will conduct the installation of the <br />monitoring wells by using a hollow stem auger drill rig. <br />• Boring logs, documenting soil lithology every 5ft, will be completed by a field <br />geologist. The Unified Soil Classification System will be utilized to describe the soil <br />lithology at each monitoring well installation location. <br />MILLER BROOKS <br />P:\707 Cove Contra ctors\Groundwater\Well Installation Workplans\Work Plan MW-12_MW-13_FINAL.dc -i arc <br />