1 INTRODUCTION <br /> On behalf of Cove Contractors, Inc., Miller Brooks Environmental, Inc. (Miller Brooks), has <br /> prepared this Corrective Action Plan to evaluate, and potentially mitigate, elevated methane <br /> gas concentrations reported from the perimeter landfill gas probes for the facility located at <br /> 3242 South EI Dorado Street in Stockton, California (Figure 1). Initial activities will verify whether <br /> the elevated methane detections at the site are indicative of an offsite release. If offsite <br /> migration of methane is confirmed, corrective action will be initiated in accordance with the <br /> technology evaluation presented below. <br /> This Corrective Action Plan is being submitted to comply with the request made the California <br /> Integrated Waste Management Board (CIWMB) in their March 25, 2008 letter. Specifically, the <br /> detection of elevated methane in two of the perimeter gas probes required action in <br /> accordance with Title 27 of the California Code of Regulations, Section 20937(a)(3) [27 CCR <br /> 20937(a)(3)]. <br /> 1.1 DOCUMENT ORGANIZATION <br /> The Corrective Action Plan is organized in the subsequent sections as follows: <br /> • Section 2 - Site Description and Background - Describes the Site location, geological <br /> and hydrogeologic conditions, as well providing summaries of the Site's history and <br /> previous site activities. <br /> • Section 3 - Remedial Action Objectives - This section defines the nature and extent of <br /> the landfill gas impacts and develops the remedial action objectives. <br /> • Section 4 - Release Verification - Methodology to determine if elevated methane <br /> detections to date are indicative of an offsite release. <br /> • Section 5 - Identification and Screening of Remedial Activities -A review and screening <br /> of remedial technologies is presented in this section along with the selection of the most <br /> appropriate remedial technology for the Site. <br /> • Section 6 - Implementation of Preferred Alternative - This section describes the <br /> implementation of the preferred remedial activities/alternative. <br /> • Section 7-Schedule <br /> • Section 8 - References <br /> MF Mic«�iolrur� <br /> P:\707 Cove Contractors\Feasibility Study and Corrective Action Plan\Corrective Action Plan_Final.do, J <br />