My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1991
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1333
>
4400 - Solid Waste Program
>
PR0440009
>
ARCHIVED REPORTS
>
ARCHIVED REPORTS_1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 2:09:38 AM
Creation date
7/3/2020 11:12:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1991
RECORD_ID
PR0440009
PE
4445
FACILITY_ID
FA0000428
FACILITY_NAME
CENTRAL VALLEY WASTE SERVICES
STREET_NUMBER
1333
Direction
E
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
APN
SEE COMMENTS
CURRENT_STATUS
01
SITE_LOCATION
1333 E TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440009_1333 E TURNER_1991.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN VALLEY UNIFIED <br /> AIR POLLUTION CONTROL DISTRICT <br /> SAN JOAQUIN COUNTY ZONE <br /> Suggested Mitigation Measures <br /> A. Emissions generated during the construction process are of <br /> concern to the District. The following dust control <br /> practices should be implemented: <br /> 1) All material excavated or graded should be sufficiently <br /> watered to prevent excessive amount of dust. Watering <br /> should occur at least twice a day with complete coverage, <br /> preferably in the late morning and after work is done for <br /> the day. <br /> 2) All clearing, grading earth moving or excavation activities <br /> shall cease during periods of high winds greater than 20 <br /> mph average over one hour. <br /> 3) All material transported off-site shall be either <br /> sufficiently watered or securely covered to prevent <br /> excessive amount of dust. <br /> 4) The area disturbed by clearing, earth moving or excavation <br /> activities should be minimized at all times. <br /> 5) The developer should mow instead of disking for weed <br /> control, thereby leaving the ground undisturbed and with <br /> a mulch covering. <br /> B. After clearing, grading, earth moving, or excavation operation, <br /> fugitive dust emissions during construction phase should be <br /> controlled by the following methods: <br /> 1) All inactive portions of the construction site should be <br /> seeded and watered until grass growth is evident. <br /> 2) All active portions of the site shall be sufficiently <br /> watered to prevent excessive amount of dust. <br /> C. At all times, fugitive dust emissions should be controlled <br /> using the following procedures: <br /> 1) On-site vehicle speed shall be limited to 15 mph. <br /> 2) All area with vehicle traffic should be watered <br /> periodically for stabilization of dust emissions. <br /> 3) Use of petroleum-based dust palliative shall meet the road <br /> oil requirements of the District's Rules 409.5 Cutback <br /> Asphalt Paving Materials. <br />
The URL can be used to link to this page
Your browser does not support the video tag.