Laserfiche WebLink
1 <br /> 1 7) Construct a 10' high noise wall or berm surrounding the west and <br /> southwest side of the waste and metal recovery area. <br /> 1 8 Construct a 12' high noise wall along the east property line from Turner <br /> Road north to the shop building. <br /> 1 9 Monitor off-site noise effects and take remedial action as needed to bring <br /> g <br /> off-site impacts into compliance to the extent they are attributable to the <br /> 1 transfer station. <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> i <br /> 1 <br /> 1 <br /> 35 <br />