Laserfiche WebLink
TABLE 1-1 <br /> SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES <br /> Significance <br /> Potential Impact Before Mitigation Measures Significance <br /> Mitigation <br /> Measures Mitigation <br /> Measures <br /> standards, including a hazardous materials survey <br /> and proper removal of asbestos-containing <br /> materials or lead-based paint, in accordance with <br /> applicable local, state and federal laws and <br /> regulations, if any hazardous materials are <br /> discovered in structures to be demolished. <br /> Project Odor Impacts LS None required <br /> 4. BIOLOGICAL RESOURCES <br /> Project Impacts on Biological Resources LS None required <br /> 5. CULTURAL RESOURCES <br /> Project Impacts on Cultural Resources PS 1. The ODS shall make application for a demolition <br /> permit for existing residences located along the <br /> south side of Weber Avenue. The ODS shall abide <br /> by the decision of the Director of Community <br /> Development, including any conditions that may be <br /> imposed on the demolition permit. <br /> 2. If any subsurface cultural resources are LS <br /> encountered during construction of the project, all <br /> construction activities in the vicinity of the encounter <br /> shall be halted until a qualified archaeologist can <br /> examine these materials, make a determination of <br /> their significance and recommend mitigation <br /> measures. The City of Stockton Community <br /> Development Department shall be notified, and the <br /> ODS shall be responsible for implementing <br /> mitigation measures recommended by the <br /> archaeologist for any identified significant cultural <br /> 121339/ST011R226 1-7 October 14, 2011, <br /> Copyright 2011 Kleinfelder / <br /> KLE/NFELDER <br /> \\ Bright People.Right Solutions. <br />