My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014 NOV TPR
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieved Reports
>
ARCHIVED REPORTS_2014 NOV TPR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 3:14:45 PM
Creation date
7/3/2020 11:14:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014 NOV TPR
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440011_9999 S AUSTIN_2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> A. the DTSC). These agencies keep abreast of state-of-the-art Information on leachate <br /> generation mechanisms and appropriate mitigation. If, in the future,monitoring demonstrates <br /> that the procedures above were insufficient to mitigate the effects of landfill-generated <br /> leachate,the agencies will,as appropriate, require additional mitigation measures. <br /> f. 48(F.6) <br /> Proposed as Part of the Project: <br /> Maximum pre-loaded settlement of the combined landfill is projected in the JTD to provide.the <br /> maximum period for settlement, and take advantage of anticipated improvements in <br /> geosynthetic technology. <br /> Future design for the vertical expansion will,if necessary, include additional components in <br /> the liner system,depending on future differential settlement on the liner system. <br /> The extraction wells proposed as part of the Revised Engineering Feasibility Study(AEE, <br /> 20016)will be maintained and monitored during combined landfill build-out phases, and <br /> modified as needed based on the RWQCB's review of monitoring data. <br /> The appropriate responsible agencies,the CIWMB and RWQCB, shall conduct a review of <br /> the liner and leachate collection system for the vertical expansion over the existing landfill(s) <br /> proposed in the JTD. <br /> g. 48 (F.6) <br /> Proposed as Part of the Project: <br /> Because of the potential for contamination from WMU B and/or A of the shallow groundwater <br /> table downgradient and adjacent to the project, existing domestic off-site wells within 500 feet <br /> of the eastern property boundary will be sampled at the same frequency as the monitoring <br /> wells onsite and for the same constituents(see CCR,Title 27). Final determination of the <br /> -sampling program and,the evaluation of the test results, along with the appropriate mitigation, <br /> is the responsibility of the RWQCB and must be carried out under their permit authorization. <br /> Identified in EIR: <br /> Water quality at the offsite wells,such as the two private wells along Austin Road and the <br /> CYA wells,shall be monitored at least biannually(twice a year)to determine the extent that <br /> the plume impacts them. Continued operation of the groundwater exhmcdon system at the <br /> site will help limit the contaminant plume from expanding In a downgradient direction but will <br /> not address the offsite component far beyond the boundary of Austin Road Landfill unless the <br /> contamination is attenuated and diluted overtime or more extraction wetis are brought on line <br /> per the AEE(2001b)Alternative 3 proposal. However,in their revised AEE(2002a) report <br /> the proposed alternative 11 Is put forth as the only remedy to implement at this time. The <br /> RWQCB accepted alternative 11 In their letter to Forward dated Marna 11,2002. If the <br /> groundwater VOC concentrations do not attenuate at a rate that is acceptable to the RWQCB <br /> then the Board will require that Aitemative 3-or some variant on AFtemative 3-be <br /> implemented. The recent(AEE,2002a)addendum to the corrective action proposed <br /> procedures to analyze the hydrochemciai trends and trigger concerrtrations at which <br /> additional extraction wells would be considered. (Atkinson, 2002). <br /> h. 50 (F.7) <br /> Identified in EIR: <br /> Two infiltration methods are currently used at the landfill. Most of the groundwater currently <br /> pumped by the former agricultural well is used onsite;thus, some of it will infiltrate through <br /> the unlined parts of the site and migrate back to the groundwater aquifer from where it was <br /> extracted. Secondly,the treated groundwater from the groundwater extraction system is <br /> San Joaquin County UP-00-7, ER-00-2tForward, Inc. <br /> Community Development Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.