Laserfiche WebLink
discharged into Littlejohns Creek currently,which both recharges aquifers below and moves <br /> offsite. <br /> Treated groundwater from the groundwater extraction system is proposed to be Infiltrated <br /> back to the aquifer through an infiltration basin (AEE, 20018,2002a)located near well <br /> MW-1 1. The infiltration basin would improve recharge to the local aquifer and is also <br /> designed to create a hydraulic barderto inhibit further northward migration of the <br /> groundwater plume. The RWQCB letterto Forward dated March 11,2002 agreed to allow for <br /> their recharge remedy(Alternative 11)to go forward without Aftemative 3(extended <br /> pumping)while quarterly monitoring at the groundwater wells occurs. If the groundwater <br /> VOC concentrations do not attenuate at a rate that is acceptable to the RWQCB then the <br /> -Board will require that Aftemative 3,or some variant on Aftemative 3,be implemented. The <br /> recent(AEE,2002a)addendum to the corrective action proposed procedures to analyze the <br /> hydrochemical trends and trigger concentrations at which additional extraction wells would be <br /> considered. (Atkinson,2002). <br /> 1. 51 (F.8) <br /> Identified in EIR: <br /> Replacement wells(as well as additional wells north of the Austin Road Landfill to better <br /> define the leading edge of the plume)shall be Installed to mitigate against the loss of old <br /> wells as presented in the JTD currently under review by the RWQCB. The RWQCB must <br /> approve the JTD's plans for the number and location of the new wells as part of their <br /> approval process,which is separate from the EIR approval process. <br /> J. 52 Austin 1994(K3.c),Austin 2000(KU) <br /> The timing of the pumped discharge from the detention pond must not occur with the peak <br /> flow rate of Little John's Creek as this would impact downstream locations by increasing the <br /> flood hazard. Telemetry, which monitors the flow in the creek to determine the peak,should <br /> be provided This Information should then be used to coordinate the start up of the pumps. <br /> k. 56 (G.3) <br /> Proposed as Part of the Project: <br /> The project sponsor has prepared a seismicity study forthe site. If the potential maximum <br /> peak ground acceleration in the seismicity study is greater than that assumed In the - <br /> preliminary design,the final pro)ect design analysis will make modifications needed to meet <br /> the factor of safety(determinations may be subject to the approval of the CIWMB and/or <br /> RWQCB). impacts to the new liner and drainage system installed over the Austin Road <br /> Landfill will be monitored as appropriate based on any stipulations of the CIWMB and/or <br /> RWQCB. <br /> I. 57(G.4) <br /> Proposed as Part of the Project: <br /> Overall reduction—or,In some cases,elimination or improvement--of slope instability at the l <br /> project site can be achieved through the Implementation of the seismic design measures <br /> designed to meet CCR Title 27. { <br /> M. 58(G.5) <br /> Proposed as Part of the Project: <br /> The applicant's Joint Technical Document references an erosion management plan that <br /> delineates various actions to minimize erosion and sedimentation,including appropriate <br /> construction,landscaping, and maintenance of graded slopes and subsurface drainage <br /> systems. As part of that plan,grading operations will be scheduled to avoid the rainy season <br /> and be implemented by interim engineering control measures. Before grading is stopped, <br /> San Joaquin County UP-00-7,ER-00-27orward, Inc. <br /> Community Development Page 17 <br />