My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014 NOV TPR
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
Archieved Reports
>
ARCHIVED REPORTS_2014 NOV TPR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 3:14:45 PM
Creation date
7/3/2020 11:14:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014 NOV TPR
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4445_PR0440011_9999 S AUSTIN_2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I, <br /> occurs. The conditions of the active fades of a landfill, as well as tf)e leachate generated, <br /> must be monitored and professional judgment utilized at all times to keep these two factors in <br /> balance. <br /> g. 18 Forward 9993(D2) <br /> Portions of the site that either have been filled to the extent allowed or are not expected to be <br /> worked for extended periods(six months or longer)shall be sown with fast-germinating <br /> drought-tolerant grass seed and watered until a cover of vegetation is established. <br /> h. 19 Austin 1994(G1.b),Austin 2000(G1.b) (similar) <br /> The project sponsor shall seek to minimize the extent of area exposed to wind erosion. <br /> Exposed surfaces,including stockpiles, shall be vegetated to the extent possible. <br /> i, 20 Austin 9994(G9.c),Austin 2000(G1.c) <br /> Plan and phase construction and closure operations such that they do not take place <br /> simultaneously on dry windy days. Schedule particularly dusty actrrities on separate days, <br /> j. 21 Austin 9994(G1.co,Austin 2000(G9.d) <br /> Design the site filling plan to facilitate screening of the active face from the prevailing winds, <br /> whenever possible, to minimize the amount of windblown dust released from the working <br /> face, <br /> k. 22 Austin 9994(G9.e),Austin 2000(G1.e) <br /> Haul trucks carrying easily airborne material shall be covered during transport and sprayed <br /> with water prior to dumping If it is shown that this would reduce dust emissions during off- <br /> loading activities within the landfill. <br /> 1. 23 Austin 1994(G1.0,Austin 2000(G1.0 <br /> The landfill operator shall restrict truck and equipment travel over loose, uncompacted, <br /> unpaved surfaces. <br /> m. 24 Forward 1993(D5) <br /> A particulate/meteorological monitoring station should be installed on the project site, <br /> preferably near the site boundary with one of the closer resfdentW receptors. This monitoring <br /> station should be operational for a minimum of six months during the dry season(Aprl!- <br /> September)before landfill activity begins to intensify as a result of prat implementation. <br /> Data should be collected daily during this baseline period, during Hie landfill's transition to <br /> higher project-related activity levels, and during the landfill's peak operational phases <br /> thereafter. If the more intensive landfill operations are found to kxrernent the 24-hour <br /> average of the annual average PM10levels by more than 5 ughm3 over baseline, <br /> respectively, even with the implementation of all the above-mentioned dust controls, further <br /> dust control measure and/or limits on the amount of waste received at the site may be <br /> necessary to control PM10 Impacts. <br /> n. 25 Forward 1993(D6) <br /> Forward, Inc,shall schedule regular deliveries of waste at the landffil to minimize queuing and <br /> Idling. <br /> o, 26 Austin 1994(G2,b),Austin 2000(G2.b) <br /> The idling of all internal combustion equipment shall be limited to ten minutes at any given <br /> time. <br /> San Joaquin County UP-00-7, ER-MZForward, Inc. <br /> Community Development Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.