Laserfiche WebLink
Consolidated Forwaz_-nc.Landfill Page 2 <br /> This Monitoring and Reporting Program includes a Checklist designed to facilitate verification <br /> and monitoring of project compliance with required mitigation measures. This document will <br /> be used by San Joaquin County to verify inclusion of required project design features and <br /> ongoing mitigation measures. The Checklist serves as a summary so that public officials,the <br /> Applicant,and the public can easily determine which measures have been complied with,and <br /> to what extent. <br /> 2.0 NIITIGATION MONITORLIG AND REPORU IG PROGR NI CHECKLIST <br /> The Mitigation Monitoring and Reporting Program Checklist is proposed for monitoring the <br /> implementation of the mitigation measures contained in the Environmental Impact Report and previous <br /> E1Rs on the project site(see Attachment 1 for a listing of mitigation measures). The County should <br /> implement the monitoring program as follows: <br /> • The Director of the San Joaquin County Community Development Department,or designee, <br /> should be responsible for coordination of the monitoring program including the monitoring <br /> checklist(Attachment 2). I <br /> • Each responsible individual or agency will be responsible for determining whether the mitigation <br /> measures contained within the checklist have been complied,%ith. {ince all mitigation measures -. <br /> have been complied with,the responsible individual or agency should submit a Verification <br /> Report Form(Attachment 3),or similar form,and a completed checklist to the Director. <br /> • If a responsible individual or agency determines that a non-compliance has occurred,a written <br /> notice should be delivered to the Director describing the non-compliance and requiring <br /> compliance within a specified period of time. <br /> 3.0 EUPI..EMENTATTON <br /> The Director of the San Joaquin County Community Development Department would be responsible for <br /> overall implementation and administration of the Mitigation Monitoring and Reporting Program Checklist <br /> for the proposed Consolidated Forward Landfill Project. <br /> Duties of the Director would include the following: <br /> • Plan checks. <br /> • Coordinate with applicable agencies that have mitigation monitoring and reporting <br /> responsibilities. <br /> • Assure follow-up and response to citizens'complaints. <br /> • Develop forms and checklists for reporting. A sample Verification Report Form is included <br /> (Attachment 3). <br /> • Maintain the Mitigation Monitoring and Reporting Program Checklist or other suitable mitigation <br /> compliance summary. <br />