Laserfiche WebLink
Consolidated Forward --.Landfill Page 6 <br /> grinder/screener have a sufficient moisture content to prevent generation of visible dust <br /> or particulate matter. ( <br /> 1' <br /> 14(D.5) <br /> Proposed as Part of the Project: <br /> Measures that reduce landfill traffic and operations impacts through the use of Best Available <br /> Control Methods(BACMs) as defined by the San Joaquin Valley Unified Air Pollution <br /> Control District(SJVUAPCD)shall be required to reduce this cumulative impact. <br /> IS Austin 1994(G5.b),Austin 2000(G5.b) <br /> Excessively odorous wastes shall be mixed immediately with other landfall wastes, depending <br /> on their nature and source. If diluting the intensity of odor is not szgjz ent,then the operator <br /> shall immediately cover offensive materials as soon as they arrive ar the landfill. <br /> 16 Austin 1994(GS.c),Austin 2000(GS.c) <br /> The operator shall ensure that loading, unloading, and material handling activities are <br /> carried out efficiently and without delays to avoid excessive odors. <br /> 17 Forward 1993(DI) <br /> t'se water trucks andlor sprinkler systems to apply water a minimum of twice daily to <br /> roadways and active faces of asbestos disposal areas to minimize airborne dust leaving the <br /> site. It is recognized that a balance must be struck between maintaining sufficient moisture <br /> for dust control and applying too much moisture such that the generarion of excess leachate <br /> occurs. The conditions of the active faces of a laneill, as well as the leachate generated, <br /> must be monitored and professionaljudgment utilized at all times to keep these two factors in <br /> balance. <br /> 18 Forward 1993. (D2) <br /> Portions of the site that either have been f lied to the extent allowed or are not expected to be <br /> tisorked for extended periods(six months or longer)shall be sown xuh fast-germinating <br /> drought-tolerant grass seed and watered until a cover of vegetation is established. <br /> 19 Austin 1994(Gl.b),Austin 2000(GI-b)(similar) <br /> Theproject sponsor shall seek to minimize the extent of area exposed to wind erosion. <br /> Exposed surfaces,including stockpiles,shall be vegetated to the exert possible <br /> 20 Austin 1994(GI.c),Austin 2000(GLc) <br /> Plan and phase construction and closure operations such that they do not take place <br /> simultaneously on dry windy days. Schedule particularly dusty activ*ies on separate days. <br /> 21 Austin 1994(GU),Austin 2000(GI-d) <br /> Design the site ftlling plan to facilitate screening of the active face from the prevailing winds, <br /> Wheneverpossible,to minimise the amount of windblown dust released from the working <br /> face. <br /> 22 Austin 1994(Gl.e),Austin 2000(GI-e) <br /> Haul trucks carrying easily airborne material shall be covered during transport and sprayed <br /> with water prior to dumping if it is shown that this would reduce dzrst emissions during off- <br /> loading activities within the landfill. <br /> 23 Austin 1994(G1 J),Austin 2000(GI-fi ��, <br />